Home
FacebookTwitterSearchMenu
  • Subscribe
  • Subscribe
  • News
  • Features
  • Knowledge Library
  • Columns
  • Customs
  • Jobs
  • Directory
  • FX Rates
  • Categories
    • Categories
    • Africa
    • Air Freight
    • BEE
    • Border Beat
    • COVID-19
    • Crime
    • Customs
    • Domestic
    • Duty Calls
    • Economy
    • Employment
    • Energy/Fuel
    • Events
    • Freight & Trading Weekly
    • Imports and Exports
    • Infrastructure
    • International
    • Logistics
    • Other
    • People
    • Road/Rail Freight
    • Sea Freight
    • Skills & Training
    • Social Development
    • Sustainability
    • Technology
    • Trade/Investment
    • Webinars
  • Contact us
    • Contact us
    • About Us
    • Advertise
    • Send us news
    • Editorial Guidelines
Road/Rail Freight
Domestic

Sanral could close vital Western Cape tunnel for repairs

17 Jul 2018 - by Staff reporter
0 Comments

Share

  • Facebook
  • Twitter
  • Google+
  • LinkedIn
  • E-mail
  • Print

The Huguenot Tunnel on the N1 between Worcester and Paarl could be closed for up to four months in 2019 in order for the South African National Roads Agency Limited (Sanral) to repair and replace safety equipment in the primary tunnel.

Over the weekend it emerged that the equipment was red-flagged as far back as 2015, was fast approaching the end of its shelf life, and that passage could safely be redirected to a secondary tunnel without any delays to traffic flow.

But modernising what it is essentially a service tunnel for safe and smooth passage would have cost Sanral around R2m – money the agency says it doesn’t have.

As a result it has no option but to block off the tunnel to do the necessary refurbishment which could cripple logistics in and out of the winelands basin west of the Hex River Mountains.

Although refurbishing existing safety equipment to the primary tunnel is not as costly as upgrading the service tunnel, the longer-term ramifications of closing the tunnel come at a much higher price to the Western Cape economy and hinterland transport going north east.

Sanral says traffic will have to be diverted over the Du Toitskloof Pass, the original way across the mountains prior to the tunnel’s opening in 1988.

Logistically there are alternative routes from Worcester on the R43 south to Rawston and north to Wellington.

But these routes could lead to lengthy delays and congestion in areas not catering for a spike in traffic.

It means that the Du Toitskloof Pass could once again see the kind of traffic it used to experience before the 3.9km tunnel was opened.

Back then it took an additional 11kms to traverse the treacherous Du Toit’s Peak that’s often shrouded in mist and fog, if not rendered completely impassable by inclement weather.

Conservative estimations say passage through the tunnel is around 30min faster than going up and down the twisty turns of the pass.

On any given day, however, risks such as rock falls and unexpected obstructions can add an hour or more to travel time on the pass.

Sanral says it is waiting for government to advise the agency on alternative revenue models brought on by e-toll non-payment in Gauteng and a recent DA-led Cape High Court case that stopped the agency from tolling highways through the winelands.

At the moment Sanral’s last toll gate upon entering the Western Cape from the tunnel is north of Paarl.

Sanral’s CEO SKhumbuzo Macozoma was quoted over the weekend saying the agency made around R1.1 trillion annually compared to the R2.5 trillion it needed to run operations.

He said only about 30% of road users were helping Sanral to foot the bill for the Gauteng Freeway Improvement Project, and that anti-toll activism elsewhere was severing the agency’s lifeline.

In the meantime it is waiting to hear from the Office of the President, the Department of Transport, and Treasury about alternative revenue streams other than tolling, Sanral’s primary profit-making mechanism.

The agency didn’t say when in 2019 the Huguenot Tunnel might be closed.

Sign up to our mailing list and get daily news headlines and weekly features directly to your inbox free.
Subscribe to receive print copies of Freight News Features to your door.

Export reg for Lesotho going ahead with July 1 deadline

Imports and Exports
Logistics

It is understood that RSL has undertaken to address and resolve agents' concerns by June 27.

26 Jun 2025
0 Comments

Vessel carrying 3 000 new vehicles sinks

Sea Freight

The crew abandoned ship after a fire broke out while it was en route to Mexico.

26 Jun 2025
0 Comments

Cabotage restrictions: Merchant Shipping Bill’s threat exposed

Imports and Exports
Logistics
26 Jun 2025
0 Comments

Chicken farmers warn of US poultry import risk

Imports and Exports

The sector has urged the government to reverse a decision allowing the US to control its own export bans.

26 Jun 2025
0 Comments

OPINION: SA’s energy future depends on speed, scale and grid connectivity

Economy
Technology

The June update builds on earlier projections from July 2024, incorporating substantial changes following November's draft Integrated Resource Plan.

26 Jun 2025
0 Comments

Mental health claims the most seafarers – survey

Sea Freight

Mental health challenges among seafarers have long been described as a silent epidemic.

26 Jun 2025
0 Comments

IMO campaign targets bullying aboard ships

Sea Freight

Maritime industry marks Day of the Seafarer, with focus on dignity and safety on every vessel.

26 Jun 2025
0 Comments

Hormuz tension triggers surge in war-risk insurance premiums

Logistics
Other
25 Jun 2025
0 Comments

Lobito Corridor construction steaming ahead

Imports and Exports
Infrastructure
Logistics

The corridor is designed to facilitate the export of copper and agricultural products through Angola.

25 Jun 2025
0 Comments

Grindrod reports slip in interim volumes for year to date

Logistics

The company reaffirmed its commitment to improving throughput across its network.

25 Jun 2025
0 Comments

MSC's $23 billion terminals take-over deal under threat

Logistics

Together with BlackRock, the line submitted a joint bid worth $22.8 billion in March.

25 Jun 2025
0 Comments

Infrastructure alone not the only trade shortcoming – corridor specialist

Infrastructure
Logistics

PPP disconnects is one of the issues highlighted by the IMD’s report.

25 Jun 2025
0 Comments
  • More

FeatureClick to view

Road & Rail 27 June 2025

Border Beat

Forum tightens net against border corruption
25 Jun 2025
Police clamp down on cross-border crime
17 Jun 2025
Zim's anti-smuggling measures delay legitimate freight operations
06 Jun 2025
More

Poll

Has South Africa's ports turned the corner?

Featured Jobs

New

Export Controller

Lee Botti & Associates
Durban
30 Jun
More Jobs
  • © Now Media
  • Privacy Policy
  • Freight News RSS
  • About Us
  • Advertise
  • Send us news
  • Contact us