Home
FacebookTwitterSearchMenu
  • Subscribe
  • Subscribe
  • News
  • Features
  • Knowledge Library
  • Columns
  • Customs
  • Jobs
  • Directory
  • FX Rates
  • Categories
    • Categories
    • Africa
    • Air Freight
    • BEE
    • Border Beat
    • COVID-19
    • Crime
    • Customs
    • Domestic
    • Duty Calls
    • Economy
    • Employment
    • Energy/Fuel
    • Events
    • Freight & Trading Weekly
    • Imports and Exports
    • Infrastructure
    • International
    • Logistics
    • Other
    • People
    • Road/Rail Freight
    • Sea Freight
    • Skills & Training
    • Social Development
    • Technology
    • Trade/Investment
    • Webinars
  • Contact us
    • Contact us
    • About Us
    • Advertise
    • Send us news
    • Editorial Guidelines

Beitbridge infrastructure is on the verge of collapse, warns Zimbabwe

15 Feb 2009 - by Staff reporter
0 Comments

Share

  • Facebook
  • Twitter
  • Google+
  • LinkedIn
  • E-mail
  • Print

The Beitbridge infrastructure will
collapse by mid 2009 if nothing
is done. And both governments
are aware of this,” says Angeline Mashiri,
the head of the Zimbabwe Revenue
Authority (Zimra) at Beitbridge.
“I have already written to get authority
to use the old bridge for vehicle traffic
again; we are now just waiting for the
bridge to be inspected.
“Depending on the recommendation
of the inspectors, we have a number of
options on how to utilise the bridge. We
can separate the north and southbound
traffic via the old and new bridge or,
if we cannot run commercial traffic on
the old bridge, we can run it on the new
bridge and use the old bridge for private
traffic.
“Processes are not the problem,
infrastructure is. As long as we do
not have four lanes to South Africa
and four lanes to Zimbabwe we will
have problems. Currently all lanes
convert into one which is a major cause
of congestion.”
Mashiri also notes that the lack of
pre-clearance and adequate parking
for commercial vehicles on the South
African side is a major problem.
“Traffic should flow continuously.
We can move 30 cars, 20 empty trucks
and 20 loads from Zimbabwe but then
we have to wait for parking spaces to
become available on the South African
side or all the traffic gets stuck on the
bridge. We currently have guys with
walkie-talkies on the bridge to let us
know when there are parking spaces for
trucks.
“All trucks, except for those
originating locally, have to be precleared
in Harare for Zimbabwe or else
they are turned back at the border post.
But this is not the case for South Africa
and they are therefore not ready for the
trucks from our side. The ideal would be
for all trucks to have pre-clearance for
both sides of the border as this will ease
congestion considerably.
“On the part of Sars and Zimra, we
have really tried and I am getting all the
co-operation I need. What is not spread
over the 24 hours that we are open is
the movement of trucks. There is a need
for some form of professionalism from
all stakeholders. The industry needs to
complement each other.
“Agents must get up if they are
phoned at two in the morning and
a truck is waiting or otherwise the
transporters need to go to someone else
who will. Mismanagement in the offices
of transporters should not become the
problem of customs.”

Sign up to our mailing list and get daily news headlines and weekly features directly to your inbox free.
Subscribe to receive print copies of Freight News Features to your door.

Cross-Border Focus 2009

View PDF
Industry and government should jointly address efficiency
15 Feb 2009
Twenty new trucks on the road
15 Feb 2009
Daylight-only driving policy hinders flow of traffic at Beitbridge
15 Feb 2009
New track and trace system adds value for M&B customers
15 Feb 2009
UN cites poor infrastructure as Africa’s biggest limitation
15 Feb 2009
Demand for containers to Zambia unprecedented
15 Feb 2009
One-stop border post
15 Feb 2009
‘Bridge country status’ keeps Swazi rail viable
15 Feb 2009
What was confiscated
15 Feb 2009
Disunity sabotages smooth border operation
15 Feb 2009
Operator reluctance
15 Feb 2009
‘Make sure paperwork is in order’
15 Feb 2009
  • More

FeatureClick to view

Namibia 23 May 2025

Border Beat

BMA steps in to help DG and FMCG cargo at Groblersbrug
21 May 2025
The N4 Maputo Corridor crossing – congestion, crime and potholes
12 May 2025
Fuel-crime curbing causes tanker build-up at Moz border
08 May 2025
More

Featured Jobs

New

JNR Seafreight Export Controller

Tiger Recruitment
Johannesburg (Linbro Park)
28 May
New

Supply Chain Specialist

Lee Botti & Associates
Cape Town
28 May
More Jobs
  • © Now Media
  • Privacy Policy
  • Freight News RSS
  • About Us
  • Advertise
  • Send us news
  • Contact us