Home
FacebookTwitterSearchMenu
  • Subscribe
  • Subscribe
  • News
  • Features
  • Knowledge Library
  • Columns
  • Customs
  • Jobs
  • Directory
  • FX Rates
  • Contact us
    • Contact us
    • About Us
    • Advertise
    • Send us news
    • Editorial Guidelines

Goal is 2.1 million tons of manganese through Lüderitz

19 May 2022 - by -
0 Comments

Share

  • Facebook
  • Twitter
  • Google+
  • LinkedIn
  • E-mail
  • Print

Work has started on increasing the capacity of the Port of Lüderitz and the transport infrastructure from the Northern Cape to handle up to 2.2 million tons of manganese a year from the current 720 000 a year.This will be achieved through the introduction of a barge-to-ship transfer to offshore post-Panamax-sized vessels, the upgrading of the rail link to South Africa, and investment in more efficient truck trailer combinations.The Namibian Ports Authority (Namport) has awarded the contract for the development and operation of a common-user manganese export terminal (CUMET) in the Port of Lüderitz to Lüderitz Bay Shipping and Forwarding, a Bidvest company. According to the environmental impact assessment, the manganese will be stored in a new, fully enclosed warehouse, to be built on the remaining piece of vacant land on the quayside. Manganese ore will be received by third parties via road and rail from the Northern Cape. The ore will be off loaded directly in the warehouse where it will be stockpiled using front-end loaders and excavators. Barges will berth at the nearby quay wall and ore will be loaded directly into the barges’ hulls, via enclosed conveyors. It was decided to use barges because one of the major limiting factors of the Port of Lüderitz is water depth. Due to hard bedrock, deepening of the port is currently not feasible, according to the EIA. The current water depth at the quay wall is -8.15 mCD and this limits shipments to 30 000 tons per shipment or approximately 650 000 tons per year. The CUMET project has to implement two main aspects to increase the annual shipments through the more efficient loading of vessels berthed in the port, and transhipment to a large post-Panamax or mini-capesize mother vessel.The new warehouse will be able to store 158 000 tons of ore and will cover an area of around 12 000 square metres.Ore will be piled up to around 8.9 metres. There will be four to five bays to handle different grades of ore, and separate entry and exit points for trucks, as well as plans for a rail siding.The barges will initially be loaded with skips, but this will be replaced by a belt loading system capable of handling 750 tons an hour. There are plans to reduce the number of trucks on the road, which is set to increase to 204 a day when the terminal is operating at full capacity.According to the EIA, the introduction of a road traffic management system (RTMS) and purpose-built trucks can reduce this to 141 trucks per day – or triple the volume of ore with twice the present number of trucksThis would be further reduced if the rail capacity was increased. If the export target volume of 2.2m tons is reached, a barge will occupy the berth for 12 days per month, transferring ore to two 92 000-ton post-Panamax vessels a month.

Sign up to our mailing list and get daily news headlines and weekly features directly to your inbox free.
Subscribe to receive print copies of Freight News Features to your door.

Namibia May 2022

View PDF
Goal is 2.1 million tons of manganese through Lüderitz
19 May 2022
Conditions for concessionaire
19 May 2022
Concessioning of Walvis Bay new container terminal could be game changer
19 May 2022
Insurance vital for imported cars
19 May 2022
Walvis Bay Corridors ‘open for business’
19 May 2022
Zimbabwe looks west for ocean gateway
19 May 2022
Woker Freight Services expands its portfolio
19 May 2022
Trade deficit expands in 2021
19 May 2022
Truck smashes account for 6% of road accidents
19 May 2022
Namport steering National Single Window project
19 May 2022
Logistics portal links loads with trucks
19 May 2022
May 2022 Namibia 5Importers adapt to disruptions related to Ukraine invasion
19 May 2022
  • More

FeatureClick to view

Sea Freight May 2025

Border Beat

The N4 Maputo Corridor crossing – congestion, crime and potholes
17 minutes ago
Fuel-crime curbing causes tanker build-up at Moz border
08 May 2025
Border police turn the tide on illegal crossings
29 Apr 2025
More

Featured Jobs

New

Sales & Marketing Assistant

Lee Botti & Associates
Johannesburg - North
12 May

Transport Clerk (DBN)

Tiger Recruitment
Durban (New Germany)
09 May

Operations’ Coordinator

Brinks Security PTY LTD
Johannesburg
09 May
More Jobs
  • © Now Media
  • Privacy Policy
  • Freight News RSS
  • About Us
  • Advertise
  • Send us news
  • Contact us